Civil Reinstatement & Project Handover

Professional reinstatement is part of construction delivery, not an afterthought.

KZ COM undertakes civil make-good works associated with excavation and infrastructure installation, including applicable asphalt, concrete and surface reinstatement.

Rectangular patch of fresh asphalt reinstating an excavation in a sealed town-centre road.
Where it fits
The close-out of every excavation, through to practical completion and handover.
Typically engaged by
Principal contractors, builders, developers and asset owners.

Scope

What the scope covers

Works are planned around the existing surface, construction specification and site requirements, with relevant completion photographs and records provided where required by the project.

  • Asphalt reinstatement

    Clean saw-cut edges, a compacted base and new asphalt laid and compacted to the level of the surrounding surface.

  • Concrete reinstatement

    Footpaths, driveways and crossovers reinstated in concrete to match the existing finish and joints.

  • Pavers, turf and landscaped surfaces

    Pavers relaid, and turf and garden areas restored.

  • Completion checks

    Depths, pit levels, conduit continuity and surface finish checked during and at the end of the work.

  • Completion records

    Completion photographs, reinstatement details and as-built information (routes, depths, pit positions) prepared where the project requires them.

  • Site clean-up

    Spoil removed, materials cleared and the site left tidy.

Delivery

Closing out a site

The order the work runs on site. Services are located and exposed before any machine excavation.

  1. Step 1

    Backfill

    Backfilled in layers and compacted.

  2. Step 2

    Surface

    Surface reinstated to match the existing material and level.

  3. Step 3

    Check

    Final quality walk, with photos.

  4. Step 4

    Hand over

    As-built information and photo record supplied.

Interfaces and records

Coordination, site constraints and handover records

What KZ COM coordinates with the other parties on the job, the constraints planned for before mobilising, and the records supplied at handover.

Delivery interfaces

Council or asset owner
Reinstatement specification, and temporary or permanent reinstatement.
Principal contractor
Quality and handover process, and inspection dates.
Designer
As-built information for the record drawings.

Site constraints planned for

  • Temporary or permanent reinstatement
  • Matching existing finishes and joints
  • Curing time and pedestrian access
  • Final inspection programme

Records supplied

  • Photo record of each reinstatement
  • Depth, level and continuity checks
  • As-built routes, depths and pit positions
  • Handover documents in your format

Fieldwork

Work from KZ COM sites

Work photographed on KZ COM sites.

View the project gallery

Before and after reinstatement

An excavation through a sealed surface and its asphalt reinstatement, photographed on the same site the same day.

Rectangular excavation cut through a sealed surface at a road edge, with the base being levelled by hand with a rake.
Newly laid black asphalt patch reinstating an excavation at a road edge, with a plate compactor beside it and a compact excavator and truck on the street beyond.
Walk-behind floor saw cutting a straight line through a sealed surface, with water used to keep the dust down.
Fresh asphalt reinstating a narrow L-shaped excavation along two edges of a concrete apron in front of an industrial unit.
Freshly finished concrete around a pit opening beside a kerb, coned and taped off while it cures.
Freshly finished concrete footpath strip beside a building entrance, with cones and barrier tape keeping pedestrians off while it cures.
New turf laid in strips along a verge beside a fenced site, with bare soil still to be covered along one edge.
Rectangular pit cover set in bare soil in a verge, with new turf being laid beside it and buildings beyond.

Health, safety & quality

Safety and quality on this scope

The controls and checks that matter most on this work.

Health, Safety & Quality

Reinstatement quality

Surfaces reinstated to match the surrounding material, level and finish, to the asset owner’s or council’s requirements for the site.

Inspection points

Depths, pit levels, conduit continuity and surface finish checked during and at the end of the work.

Handover records

Depths, routes, pit positions and photos captured as the work goes in, for the as-built package.

Environmental and site management

Site housekeeping, spoil handling, appropriate waste management and progressive reinstatement help minimise disruption during civil works.

For estimators

Information needed to price it

  • Surface types and areas to reinstate
  • The reinstatement specification for the site
  • Handover documentation format
  • Programme for final inspections
Send a tender or quote request

Scope and responsibilities

  • Temporary or permanent reinstatement is priced to the specification for the site.
  • The reinstatement specification, and who carries out permanent reinstatement, are confirmed with the asset owner, council or principal contractor for each site.

Tell us who is engaging the work and what your specification requires, and KZ COM will confirm its part before pricing.

Tender and project enquiries

Send the scope, the site location and your timing, or ask for the information your assessment needs.